EN

News

18-nl-aansluiten-elementen
Recesses: 4 steps to optimize your BIM-workflow

Want to truly understand what the other parties are doing? Recesses in architectural elements for technical installations are

Read more
17-newsgeneric
Column: BIM - A new way of working?

These times call for a different approach to work. Today, we should really look at work with a fresh pair of eyes. 

Read more
17-newsgeneric
Sharing information with IFC

IFC makes it possible to share information transparently, even if collaborating parties use different modeling platforms or

Read more
Assemble and fit prefab sets with Stabicad

Another new Stabicad update is available, and it's something very special for anyone who has anything to do with prefab or wa...

Read more
18-nl-aansluiten-elementen
End of support for SQL Server 2005

Find out what you can do if you still use SQL Server 2005.

Read more
18-nl-aansluiten-elementen
Design home automation systems with Stabicad

To help the E engineer to create innovative designs for installations that optimize the quality of living and life, Stabicad

Read more
17-newsmepcontent
The added value of MEPcontent: sustainability

There is a lot of focus on sustainability and that means that more and more solar panels will be used in new buildings to achi...

Read more
International BIM challenge at Deerns

BIM is not an end in itself. You hear this so often, but how does it work in practice? Michiel van Wijk, BIM manager at Deer...

Read more
17-newsmepcontent
Giacomini distributor and products SANHA on MEPcontent

There are updates and extensions of a few Product Lines in the categories of heating and ventilation.

Read more